Power cuts in Egypt: backup generators, ATS and UPS that keep you open
اقرأ بالعربيةLoad shedding in recent summers reminded every business in Egypt how expensive a power cut can be. A factory line stops mid-batch, a clinic loses its fridges and X-ray, a shop closes its tills and an office goes offline. Even as Egypt expands its grid and builds new cities, a well planned backup system is still the cheapest insurance most sites can buy.
What a power cut really costs
Count the lost production hours, spoiled stock, idle wages, equipment damaged by sudden shutdowns and customers who walk away. For many small factories one unplanned hour can cost more than a month of generator running. Servers, PLCs and medical devices can also be damaged when power drops and returns with a surge.
Generator, ATS and UPS: who does what
A diesel generator carries the load for hours. An ATS panel (automatic transfer switch) detects the cut, starts the generator and moves the load over within seconds, then switches back when grid power returns. A UPS bridges those seconds with batteries, so computers, servers, cash registers and lab equipment never notice the gap.
Sizing the generator correctly
List every load you must keep running, add the starting current of the largest motors and allow a margin of around 20 to 25 percent. An oversized generator running at 20 percent load burns more diesel per kWh, builds up carbon and wears faster, while an undersized one trips when a compressor starts. Most diesel generators work best at around 60 to 80 percent of their rated load.
A simple diesel example
A workshop ran a 200 kVA generator for essential loads that rarely passed 70 kW. Moving those circuits to a correctly sized 125 kVA unit, and keeping non-essential lighting and air conditioning off the backup board, typically cuts fuel use by around a quarter per outage hour. Over a summer of daily cuts that adds up to thousands of litres of diesel.
Maintenance that prevents a no-start
Most generators that fail during a cut fail because of flat starter batteries, old diesel, clogged filters or low coolant. Run the generator on load for 30 minutes every week or two, change oil and filters on the running hours schedule, test the ATS monthly and keep spare filters and a battery charger on site. UPS batteries usually last three to five years, so check their health every year.
How Palm helps
Send us a list of the equipment you need to keep running, or your electricity bill and a photo of your main panel. We will propose the generator size, ATS panel and UPS units and send a full quotation within 24 hours, with delivery anywhere in Egypt.
Frequently asked questions
What size generator do I need for a small factory?
Add up the running load of the machines you must keep on, add the starting current of the largest motors and a margin of 20 to 25 percent. Send us your equipment list and we will size it for you.
Do I need an ATS panel with my generator?
An ATS is not always required, but it switches the load automatically within seconds and avoids mistakes in manual switching. For clinics, cold rooms and production lines it is strongly recommended.
How long does a UPS last during a power cut?
It depends on the load and battery capacity. Most office UPS units are sized for 5 to 30 minutes, enough to bridge until the generator starts or to shut down safely; longer backup needs extra battery packs.
Browse the products or request a quotation. We reply within 24 hours and deliver anywhere in Egypt.